Full Depth Reclamation with Expanded Asphalt Highway 527

ROTO-MILL INC. worked with Pioneer Construction on contract MTO Project 2020-6002. This project was located on Highway 527 approximately 60km North of Highway 17. This project consisted of full depth reclamation to a depth of 150mm and then was graded and compacted. Then the highway was stabilized to a depth of 150mm full depth recycling with expanded asphalt resulting is a stabilized base asphalt. Finally Pioneer Construction paved surface asphalt of 50mm SP 12.5. 